• IEatDaFeesh@lemmy.world
    link
    fedilink
    arrow-up
    17
    ·
    2 days ago

    Eventually we’ll so be doing this out of necessity. Just not any time soon, not until something big breaks.

    • lefaucet@slrpnk.net
      link
      fedilink
      arrow-up
      6
      ·
      2 days ago

      Well things are all going great. Can’t imagine anything breaking. Can’t imagine electrical grids getting overwhelmed from infrastructure neglect and a surge in demand or fossil fuels becoming scarce or their flows being interrupted. When was the last time any of that stuff happened?

      • m3t00🌎🇺🇦@lemmy.world
        link
        fedilink
        English
        arrow-up
        4
        ·
        2 days ago

        maybe the data-center upgrades will payoff when the ai bubble pops and everyone drives ev because of gas prices. infrastructure pre-built. ev charging cheaper at night so off peak already best on existing grid.

        • P00ptart@lemmy.world
          link
          fedilink
          arrow-up
          3
          ·
          2 days ago

          Those things are going to get scrapped so fast when America falls. Ya know how eventually locals used the stones from the pyramids, the lighthouse of Alexandria, and the Roman colosseum? Well, that but scrapping chips and copper from abandoned data centers.