minus-squareViking_Hippie@lemmy.dbzer0.comOPlinkfedilinkarrow-up1·2 days agoTrue, but if we’re not getting rid of them, let’s at least make them useful
minus-squarepsud@aussie.zonelinkfedilinkEnglisharrow-up1·2 days agoMy suburban shopping centre has space for 2.2MW, it’s about 5km from the nearest power substation But they can only export 30kw into the suburban grid (10kW/phase * 3 phases) To export the other 2.17MW they would need to run high voltage main lines 5km to the nearest substation The farm nearest me has 13kW and is right near a main power line
True, but if we’re not getting rid of them, let’s at least make them useful
My suburban shopping centre has space for 2.2MW, it’s about 5km from the nearest power substation
But they can only export 30kw into the suburban grid (10kW/phase * 3 phases)
To export the other 2.17MW they would need to run high voltage main lines 5km to the nearest substation
The farm nearest me has 13kW and is right near a main power line